Kohler VEIL HT200 PNE IWT Handleiding voor installatie-instructies - Pagina 12

Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Kohler VEIL HT200 PNE IWT. Kohler VEIL HT200 PNE IWT 30 pagina's. Wall-hung toilet

463 2
438 2
Height to floor is decided by bowl.
Finished Floor
K-20341T-PNE
Floor Discharge Installation Method
Three discharge pipe installation methods based on actual
situation: A, B, C, adjust position by screw driver. Snap
discharge pipe lower end into discharge port.
1402749-T01-A
K-25442T-PNE/K-25443T-PNE/K-25443T-RE/K-25443T-EA
K-25443T-PM/K-25443T-RU/K-25443T-ML/K-25444T-PNE
151 3
Air hose
138 3
K-75890T-PNE
225 1
225 1
A B C
Kohler reserves the right to change marked dimensions without prior notice.
Installed with K-20341T-PNE
Method one:
Remote plate installation
Press from top
Suggested faceplate
installation area
R1000mm
Method four:
Press from front
Pinch plate
Air hose
Finished wall
Suggested/
K-23055T-PNE
51 1
Discharge
Elbow
Discharge
Elbow
Discharge
Elbow
-5-
K-20341T-PNE
Method two:
Remote installation of mask
Pinch
Suggested faceplate
plate
installation area
R1000mm
Air hose
80 3
K-24149T/K-24151T
225 1
A
Drain outlet
B
Drain outlet
C
Drain outlet
Method three:
Air hose
Water Tank
Bracket
90mm, welding
90mm
Water Tank
Bracket
110mm
110mm
Water Tank
Bracket
110mm, welding
110mm