Kohler Stillness K-14450 Installatiehandleiding - Pagina 5

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Kohler Stillness K-14450. Kohler Stillness K-14450 20 pagina's. Accessories
Ook voor Kohler Stillness K-14450: Installatiehandleiding (32 pagina's), Handleiding voor huiseigenaren (21 pagina's)

Kohler Stillness K-14450 Installatiehandleiding
Drywall Between Studs
Pilot Holes
Toggle Anchors
Orient wall
plate.
Press and hold
legs together.
2. Install the Wall Plate(s)
NOTE: If the pilot holes are drilled into a stud, anchors are not
required. Proceed to the "Secure the Wall Plate(s)" subsection.
Install the Anchors
For installations to drywall between studs:
Press and hold the legs of the toggle anchor (provided) together,
then insert the toggle anchor legs into each pilot hole.
Using a hammer, carefully tap each toggle anchor into the
drywall until flush against the finished surface.
For installations to tile:
Insert a ceramic anchor (provided) into each pilot hole.
Using a hammer, carefully tap each ceramic anchor into the
drywall. The ceramic anchor does not need to be flush with the
tile surface.
Secure the Wall Plate(s)
Orient the wall plate with the small round mounting hole in the 6
o'clock position, as shown.
Secure the wall plate with the two screws (provided).
Kohler Co.
Tile
Screws
Orient
wall plate.
Screws
5
Pilot Holes
Ceramic
Anchors
1013267-2-E