Kohler EVOK 2.0 25165A-0 Installatie-instructies - Pagina 4
Blader online of download pdf Installatie-instructies voor {categorie_naam} Kohler EVOK 2.0 25165A-0. Kohler EVOK 2.0 25165A-0 5 pagina's. Seamless freestanding baths
INSTALLATION
1) Unpack bath shell and skirt and check for any transit damage prior to installation.
2) Position the bath in the desired location in the bathroom.
3) Check that the plumbing can be connected to the bath when in the desired location.
4) Adjust the feet so that the bath is level. The distance from the feet to the top of the bath should conform to the
rough-in dimensions.
CAUTION:
The weight of the bath should be supported by the bath feet.
PLUMBING INSTALLATION
1) To connect the plumbing raise the freestanding bath off the floor by propping it up onto timber blocks positioned
at either end of the bath.
2) Connect the bath waste & a DN32 to DN40 adapter to an appropriate trap.
Connect the adapter and drain pipe on one end, and
the supplied cap on the other end.
3) After plumbing is complete and before lowering the bath check all connections are water tight, check for leaks.
Kohler NZ shall not be liable under warranty for damage caused by negligence.
Carefully lower the bath back onto the floor. Take care while maneuveruing the bath not to damage the base of
4)
the bath and subfloor.
5) If there are no leaks, apply a thin continuous bead of clear or color-matched silicone sealant to the seam
between the bath and the finished floor. Leave the bath for a minimum of 24 hours to allow the silicone to cure.
Apply silicone sealant
4