Kohler 15EORZDB Operatie - Pagina 29

Blader online of download pdf Operatie voor {categorie_naam} Kohler 15EORZDB. Kohler 15EORZDB 48 pagina's. Commercial/recreational mobile generator sets

Kohler 15EORZDB Operatie

3.9 Battery

Consult
the
battery
regarding battery care and maintenance.

3.10 Storage Procedure

Perform the following storage procedure before taking a
generator set out of service for three months or longer.
Follow the engine manufacturer's recommendations, if
available, for fuel system and internal engine
component storage.

3.10.1 Lubricating System

Prepare the engine lubricating system for storage as
follows:
1. Run the generator set for a minimum of 30 minutes
to bring it to normal operating temperature.
2. Stop the generator set.
3. With the engine still warm, drain the oil from the
crankcase.
4. Remove and replace the oil filter.
5. Refill the crankcase with oil suited to the climate.
6. Run the generator set for two minutes to distribute
the clean oil.
7. Stop the generator set.
8. Check the oil level and adjust, if needed.

3.10.2 Cooling System

Prepare the cooling system for storage as follows:
1. Check the coolant freeze protection using a
coolant tester.
2. Add or replace coolant as necessary to ensure
adequate freezing protection. Use the guidelines
included in the engine operation manual.
3. Run the generator set for 30 minutes to redistribute
added coolant.
TP-6551 2/14
manufacturer's
instructions

3.10.3 Fuel System

Prepare the fuel system for storage as follows:
Diesel-Fueled Engines
1. Fill the fuel tank with #2 diesel fuel.
2. Condition the fuel system with compatible
additives to control microbial growth.
3. Change the fuel filter/separator and bleed the fuel
system.

3.10.4 Exterior

Prepare the exterior for storage as follows:
1. Clean the exterior surface of the generator set.
2. Seal all engine openings except for the air intake
with nonabsorbent adhesive tape.
3. To prevent impurities from entering the air intake
and to allow moisture to escape from the engine,
secure a cloth over the air intake.
4. Mask electrical connections.
5. Spread a light film of oil over unpainted metallic
surfaces to inhibit rust and corrosion.
3.10.5 Battery
Perform battery storage after all other storage
procedures.
1. Place the generator set master switch in the OFF
position.
2. Disconnect the battery(ies), negative (--) lead first.
3. Clean the battery.
manufacturer for the battery cleaning procedure.
4. Place the battery in a cool, dry location.
5. Connect the battery to a float/equalize battery
charger or charge it monthly with a trickle battery
charger.
Refer
manufacturer's recommendations.
Maintain a full charge to extend battery life.
Section 3 Scheduled Maintenance
Refer to the battery
to
the
battery
charger
29