Kohler K-3090 Installatiehandleiding - Pagina 4

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Kohler K-3090. Kohler K-3090 29 pagina's. Mirrored cabinet
Ook voor Kohler K-3090: Installatiehandleiding (36 pagina's), Installatiehandleiding (32 pagina's), Handleiding voor huiseigenaren (16 pagina's)

Kohler K-3090 Installatiehandleiding
1. Select Cabinet Location
- Carefully select the cabinet location.
- Allow 4" (10.2cm) clearance from the bottom of the cabinet to the top of the lavatory.
- Make sure electrical power can be provided for the cabinets. Power to the cabinets should not be controlled by the
light switch.
- Complete the finished wall.

2. Wall Preparation

CAUTION: Risk of product damage and personal injury. Extend the braces beyond the cabinet to the nearest
stud. This will ensure proper support for the cabinet.
- Install two 2x4 braces for the top and bottom portions of the cabinet. Bottom brace should be located 39" (99.1cm)
from floor to center. Studs should be front notched 1 1/2" (3.8cm) for proper support. Braces should be 36"
(91.4cm) from center to center.
A
1010988-2-
2x4
Braces
Notch studs 1-1/2" (3.8cm) to
provide support for headers
36" (91.4cm)
From Centers
39" (99.1cm)
4
Kohler Co.