Aqua Creek Products PRO POOL LIFT F-004PLB-R Handleiding voor installatie en gebruik - Pagina 5

Blader online of download pdf Handleiding voor installatie en gebruik voor {categorie_naam} Aqua Creek Products PRO POOL LIFT F-004PLB-R. Aqua Creek Products PRO POOL LIFT F-004PLB-R 17 pagina's. 450 lb. (204kg) maximum capacity

Aqua Creek Products PRO POOL LIFT F-004PLB-R Handleiding voor installatie en gebruik
PRO POOL LIFT - ASSEMBLY INSTRUCTIONS
Attach Seat belt to the seat as shown.
1.
Install the PRO POOL LIFT
2.
(4) anchors using the supplied 1/2 x 1-1/2"
stainless steel hex-head bolts and 1/2"
stainless steel flat washers. Make sure all
bolts are tight before using the lift.
Plug the handset cable into the large handset
3.
socket on the bottom of the control box. Be
sure you press the cord end firmly into the
socket until you are sure it is all of the way
into the socket. Failure to fully push the
remote cord into the socket may result in
faulty or interrupted operation.
4.
Before installing the battery, place it on the
charging unit and let it charge for 24 hours.
Make sure the orange "charge" light
illuminates when the battery is being
charged.
Remove the fully-charged battery from the
5.
charger and install it on top of the Control
Box. The battery will line up square with the
control box, and will 'click' when it locks in
place properly. The lift will only operate
when the battery is mounted properly.
DO NOT LEAVE THE BATTERY ON
THE LIFT! WHEN NOT IN USE
STORE THE BATTERY ON THE
CHARGER.
onto the four
TM
Compliments of www.poolsandstuff.com
5