Aqua Creek Products F-RNGR2-02 Handmatig - Pagina 6

Blader online of download pdf Handmatig voor {categorie_naam} Aqua Creek Products F-RNGR2-02. Aqua Creek Products F-RNGR2-02 16 pagina's. Pool lift

Aqua Creek Products F-RNGR2-02 Handmatig
Anchor Installation: Core-Drill Retro-Fit
Thread the mounting hardware through the smaller anchor jig plate holes and into the
4.
anchor inserts. Be sure to use anti-seize on the threads! Confirm the tops of the inserts are flush
with the bottom of the plate.
NOTE: We recommend using masking tape around the holes on the bottom of the anchor jig plate to help prevent the
anchor plate from being accidentally epoxied to the pool deck.
Place the anchor assembly back into the holes. Wiggle the assembly as you reinsert it. Make
8.
sure the epoxy fully coats the threads.
Check that the anchor assembly is level.
9.
Once the epoxy has set up, remove the hardware and the anchor jig plate. Your lift is now
10.
ready to be mounted to the anchoring system. The anchor jig plate may be recycled or used to
install other anchors.
Copyright © 2019 Aqua Creek Products All Rights Reserved
Bond at least one of the anchor inserts
5.
according to your local code requirements.
For more information see NEC Article
680.26.
Test fit the anchor inserts to make sure
6.
they line up properly. Place the anchor
assembly into the pre-drilled holes and use
a torpedo level to ensure your anchoring
system is level.
Remove the anchor assembly and fill
7.
each hole halfway with 2-part construction
epoxy.
(CONTINUED)
6
Revised 6/17/19