Allied Telesis AT-x510-52GTX Installatiehandleiding - Pagina 7
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Allied Telesis AT-x510-52GTX. Allied Telesis AT-x510-52GTX 20 pagina's. Gigabit ethernet switches
Ook voor Allied Telesis AT-x510-52GTX: Productinformatie (8 pagina's), Installatiehandleiding (20 pagina's)
Figures
Figure 1: Front Panels of the x510 Series Switches.............................................................................................................19
Figure 2: Back Panel of the Switch.......................................................................................................................................20
Figure 3: x510 Series Management Panel ...........................................................................................................................21
Figure 4: LEDs for the 10/100/1000Base-T Ports.................................................................................................................27
Figure 5: SFP+ Slot LEDs ....................................................................................................................................................28
Figure 6: Switch ID LED .......................................................................................................................................................30
Figure 7: Switch ID LED .......................................................................................................................................................30
Figure 8: Switch ID LEDs in the Low Power Mode ...............................................................................................................31
Figure 9: Components of the x510 Series Switches.............................................................................................................41
Figure 10: Turning the Switch Upside Down ........................................................................................................................45
Figure 11: Removing the Rubber Feet .................................................................................................................................45
Figure 12: Attaching the Equipment Rack Brackets .............................................................................................................46
Figure 13: Attaching the Equipment Rack Brackets (Continued) .........................................................................................47
Figure 14: Mounting the Switch in an Equipment Rack ........................................................................................................47
Figure 15: Removing the Dust Plug from an SFP+ Slot .......................................................................................................53
Figure 16: Installing an SFP or SFP+ Transceiver ...............................................................................................................53
Figure 17: Removing the Dust Cover from an SFP or SFP+ Transceiver ............................................................................54
Figure 18: Positioning the SFP or SFP+ Handle in the Upright Position ..............................................................................54
Figure 19: Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver .......................................................................55
Figure 20: Plugging in the AC Power Cord...........................................................................................................................58
Figure 21: Switch Initialization Messages.............................................................................................................................59
Figure 22: Switch Initialization Messages (Continued) .........................................................................................................60
Figure 23: Switch Initialization Messages (Continued) .........................................................................................................61
Figure 24: Connecting the Management Cable to the Console Port ....................................................................................63
Figure 25: User Exec Mode Prompt .....................................................................................................................................64
Figure 26: SHOW STACK Command...................................................................................................................................64
Figure 27: Moving to the Global Configuration Mode ...........................................................................................................65
Figure 28: Confirmation Prompt for the NO STACK ENABLE Command ............................................................................65
Figure 29: Returning to the Privileged Exec Mode ...............................................................................................................65
Figure 30: Saving the Changes with the WRITE Command.................................................................................................66
Figure 31: Status of a Stacking Slot When VCStack is Disabled .........................................................................................67
Figure 32: Status of a Stacking Slot When VCStack is Enabled ..........................................................................................67
Figure 33: PORT Parameter in the Command Line Interface...............................................................................................68
Figure 34: RJ-45 Socket Pin Layout (Front View) ................................................................................................................75
7