Allied Telesis Rapier G6F-MT-RJ Handleiding voor snelle installatie - Pagina 5

Blader online of download pdf Handleiding voor snelle installatie voor {categorie_naam} Allied Telesis Rapier G6F-MT-RJ. Allied Telesis Rapier G6F-MT-RJ 12 pagina's. Rapier switch

Quick Install Guide
C613-04017-01 REV F

Installing the Switch

All AC and DC versions of this equipment must be earthed.
Follow these steps to install the switch:
1.
Before installing the switch, read the safety information
For safety information, see the Safety and Statutory Information booklet. A
copy of this booklet is supplied with each switch, and can also be found on
the Documentation and Tools CD-ROM or at www.alliedtelesyn.co.nz/
support/rapier/.
2.
Gather the tools and equipment you will need
If installing a DC version of the switch, you will need a DC power source,
DC supply cable, and wire strippers (see step 8).
If the switch is to be connected to a redundant power supply, you will need
a redundant power supply unit and cable (see step 10).
3.
Choose a suitable site for the switch
Either a flat surface or 19 inch rack.
4.
Unpack the switch
Verify the package contents. If any items are damaged or missing, contact
your sales representative.
5.
Install expansion options
If you purchased optional Uplink Modules, a Network Service Module
(NSM), or Port Interface Cards (PICs), install them now by following their
individual installation guides. These guides can be found on the
Documentation and Tools CD-ROM.
6.
Place the switch in its operating location
If installing the switch in a rack:
Remove the rubber feet.
Attach the rack-mounting brackets.
Mount the switch in the rack.
7.
Apply AC power to the switch (for AC models)
Plug the power cord into the AC power connector on the switch's rear
panel. The Fault LED should flash for approximately 10 seconds as the
switch runs internal tests. If the LED continues to flash or remains lit, refer
to the Rapier Switch Hardware Reference for troubleshooting information.
5