Dell PowerEdge 2900 Handmatig - Pagina 10
Blader online of download pdf Handmatig voor {categorie_naam} Dell PowerEdge 2900. Dell PowerEdge 2900 26 pagina's. Tower-to-rack conversion guide
Ook voor Dell PowerEdge 2900: Installatie-informatie (11 pagina's), Installatiehandleiding (14 pagina's), Installatiehandleiding (10 pagina's), Update (2 pagina's)
Figure 1-1. Tower-To-Rack Kit Contents
2
1
10
9
1
chassis metal filler panel
4
rack front plate
7
M3 x 8 flathead Torx screw
(34)
10 replacement control panel
display label
Recommended Tools and Supplies
•
#2 Phillips screwdriver
•
3/8-inch or 10-mm nut driver
•
T-10 Torx driver (for removing and installing the front panels)
Conversion Tasks
Installing a rack kit involves performing the following tasks:
•
Removing the bezel
•
Removing the cover, chassis panels, and stabilizer feet
•
Removing the optional 1x2 flex bay bracket
•
Removing the control panel assembly
•
Removing the tower front plate
•
Installing the rack front plate and rack ears
•
Installing the control panel assembly and metal filler panel
8
Tower-to-Rack Conversion Guide
3
8
7
2
chassis plastic filler panel (3)
5
right rack ear
8
6-32 x 0.188 flathead Phillips
screw (8)
4
6
3
left rack ear
6
rack bezel
9
10-32 shoulder nut (6)
5