Dell PowerVault 735N Installatiehandleiding - Pagina 21

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Dell PowerVault 735N. Dell PowerVault 735N 26 pagina's. Nas appliances. boot hard-disk drive
Ook voor Dell PowerVault 735N: Aanvullende handleiding (3 pagina's), Handleiding voor vervanging van hardware (10 pagina's), Handleiding bijwerken (10 pagina's), Handmatig (18 pagina's), Handleiding bijwerken (12 pagina's), Handleiding bijwerken (8 pagina's), Handleiding vervangende instructies (19 pagina's)

Dell PowerVault 735N Installatiehandleiding
support.dell.com

Installing the Cable-Management Arm

1.
Facing the back of the rack cabinet, locate the threaded hole on the back of the
slide assembly and secure the end of the cable-management arm (the end having
a bracket and thumbscrew) to the right side vertical rail (see Figure 1-11).
The bracket snaps into the square mounting holes on the vertical rail and is
secured with the captive thumbscrew.
quick-disconnect knobs

Figure 1-11. Installing the Cable-Management Arm

2.
Align the free end of the cable-management arm (the end with the half-hinge) to
the hinge-half mate on the back-right side (as viewed from the back) of the
system.
3.
Squeeze the quick-disconnect knobs on the free end of the cable-management
arm and align the two hinge halves to attach the arm to the bracket on the back of
the system chassis (see Figure 1-11).
4.
Attach the input/output (I/O) cables to their respective expansion cards on the
back of the system.
captive
thumbscrew
Rack Installation Guide
1-13