Dell EMC PowerSwitch S4200-ON Series Installatiehandleiding - Pagina 8
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Dell EMC PowerSwitch S4200-ON Series. Dell EMC PowerSwitch S4200-ON Series 19 pagina's.
To install the S4200-ON Series (S4248FB-ON and S4248FBL-ON), complete the installation procedures in the order presented
in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the switch and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
Topics:
•
Unpack
•
Rack or cabinet installation
•
ReadyRails installation
•
1U Tool-less mount installation
•
Two-post flush-mount installation
•
Two-post center-mount installation
•
Four-post threaded installation
•
S4200-ON Series switch installation
•
1U front-rack installation
•
Optics installation
•
Switch power-up
•
After switch installation
Unpack
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4200-ON Series switch, make sure that the following items are included:
● One S4200-ON Series (S4248FB-ON or S4248FBL-ON) switch
● One RJ-45 to DB-9 female cable
● Two sets of rail kits, no tools required
● Two PSUs
● Five fan units
● Two country- and region-specific AC power cords
● S4200-ON Series Set-up Guide
● Safety and Regulatory Information
● Warranty and Support Information
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container or remove the container top.
3. Carefully remove the switch from the container and place it on a secure and clean surface.
4. Remove all packing material.
5. Inspect the product and accessories for damage.
8
S4200-ON Series Installation
S4200-ON Series Installation
3