Dell Networking S6000 System Aan de slag handleiding - Pagina 25

Blader online of download pdf Aan de slag handleiding voor {categorie_naam} Dell Networking S6000 System. Dell Networking S6000 System 37 pagina's. Dell networking s6000 high-performance 10/40 gbe top-of-rack switch
Ook voor Dell Networking S6000 System: Testrapport (19 pagina's)

Dell Networking S6000 System Aan de slag handleiding
Figure 4-5. Attaching the Switch Rails
2 After you install both switch rails, line them up on the previously mounted
Ready-Rails and slide the switch in until it is flush with front of rack. About
three inches prior to full insertion, the rail locking feature engages to keep the
switch from inadvertently sliding out of the rack and falling.
Refer to
Figure
4-6.
CAUTION: Do not use the mounted Ready-Rails as a shelf or a workplace.
21
Installation