Dell POWERCONNECT 5548P Aan de slag handleiding - Pagina 15

Blader online of download pdf Aan de slag handleiding voor {categorie_naam} Dell POWERCONNECT 5548P. Dell POWERCONNECT 5548P 20 pagina's. Powerconnect 5500 series
Ook voor Dell POWERCONNECT 5548P: Release-opmerkingen (15 pagina's)

Dell POWERCONNECT 5548P Aan de slag handleiding

Booting the Switch

After the local terminal is connected, turn on power. The switch then goes
through power-on self-test (POST). POST runs every time the switch is
started and checks hardware components, to determine if the switch is
operational before completely booting. If the system detects a critical
problem, the boot process stops. If POST passes successfully, a valid
executable image is loaded into RAM. POST messages are displayed on the
terminal and indicate test success or failure.
The boot process runs for approximately 40-45seconds.
When the boot process completes, the following LEDs are lit, as shown in
Figure 3-2:
Power
Status
Fan (should be green)
RPS (if it is being used)
Figure 3-2. Initial LEDs
Power Status
Configuring the Switch
Fan
RPS
15