Dell S3100 Series Aan de slag handleiding - Pagina 31
Blader online of download pdf Aan de slag handleiding voor {categorie_naam} Dell S3100 Series. Dell S3100 Series 46 pagina's.
Ook voor Dell S3100 Series: Installatiehandleiding (45 pagina's), Aan de slag handleiding (27 pagina's)
Figure 22. Installing the Switch using a Two-Post Flush-Mount Configuration
Configuring a Two-Post Center-Mount
To install your switch in a two-post center-mount configuration, follow these steps.
1.
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post
flange with two user-supplied screws. See item 1 in the following illustration.
2.
Slide the back bracket towards the post and secure it to the post flange with two user-supplied
screws. See item 2 in the following illustration.
3.
Repeat this procedure for the second rail.
Installation
31