Dell S4100-ON Series Installatiehandleiding - Pagina 23
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Dell S4100-ON Series. Dell S4100-ON Series 47 pagina's.
Ook voor Dell S4100-ON Series: Installatiehandleiding (21 pagina's), Installatiehandleiding (48 pagina's), Installatiehandleiding (49 pagina's)
Figure 11. Two-post flush-mount installation
2
Attach one rail to the front post flange with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied
screws, see item 3.
4
Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied
screws, item 1.
S4100–ON Series installation
23