Dell S4148FE Installatiehandleiding - Pagina 20
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Dell S4148FE. Dell S4148FE 48 pagina's.
To install the S4100–ON Series (S4128F-ON, S4148F-ON, and S4148FE-ON), complete the installation procedures in the order presented in
this section.
Always handle the S4100–ON Series switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S4100–ON Series switch and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
NOTE:
For more information, see the
Topics:
•
Unpack the switch
•
Rack or cabinet installation
•
ReadyRails installation
•
S4100-ON Series installation
•
Optics installation
•
Switch power-up
•
After switch installation
•
Switch replacement
Unpack the switch
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4100–ON Series switch, make sure that the following items are included:
•
One S4100–ON Series (S4128F-ON, S4148F-ON, or S4148FE-ON) switch
•
One RJ-45 to DB-9 female cable
•
Two sets of rail kits, no tools required
•
Two PSUs
•
Four fan units
•
Two country- and region-specific AC power cords
•
Dell S4100–ON Series Setup Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
Unpack
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
20
S4100–ON Series installation
S4100–ON Series installation
Open Networking Hardware Diagnostic Guide .
4