Dell Z9100-ON Installatiehandleiding - Pagina 20

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Dell Z9100-ON. Dell Z9100-ON 43 pagina's. Open networking
Ook voor Dell Z9100-ON: Installatiehandleiding (45 pagina's), Installatiehandleiding (45 pagina's)

Dell Z9100-ON Installatiehandleiding
Figure 8. Four-Post Threaded Configuration
2.
For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at
each end. See item 2.

Install the Z9100-ON System

You can mount the system in the 1U front-rack or 1U two-post (flush and center) configurations. The
following is an example of a front-rack configuration.
For the 1U two-post (flush and center) configurations, slide the system into the rails in the same manner
as the four-post configurations.

Installing a 1U Front-Rack

Configure the rails that are attached to the system.
1.
Attach the switch rails (inner chassis members) to the Z9100-ON system. The following illustration,
item 3, shows the detail for the front standoff with the locking tab.
20
Install the Z9100–ON