Dell Z9100-ON Installatiehandleiding - Pagina 21
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Dell Z9100-ON. Dell Z9100-ON 45 pagina's. Open networking
Ook voor Dell Z9100-ON: Installatiehandleiding (45 pagina's), Installatiehandleiding (43 pagina's)
Figure 10. Two-post flush-mount configuration
2. Attach one rail to the front post flange with two user-supplied screws, item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws, item 3.
4. Repeat this procedure for the second rail.
Two-post center-mount configuration
CAUTION:
Your switch is not NEBS Earthquake Z4-compliant if you use this installation method.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws, item 1.
Z9100–ON installation
21