Miele PDR 518 Bedienings- en installatie-instructies - Pagina 32
Blader online of download pdf Bedienings- en installatie-instructies voor {categorie_naam} Miele PDR 518. Miele PDR 518 36 pagina's. Commercial tumble dryers
Ook voor Miele PDR 518: Bedienings- en installatie-instructies (38 pagina's)
Installation
The tumble dryer can either be hard-wired or connected using a plug-and-socket connec-
tion in accordance with IEC 60309-1. For a hard-wired connection, an all-pole isolation
device must be available at the installation site.
An isolation device is a switch which ensures a contact opening of more than 3 mm.
These include circuit breakers, fuses and contactors (IEC/EN 60947).
If the mains supply cannot be permanently disconnected, the isolation device (including
plug and socket) must be safeguarded against being switched on either unintentionally or
without authorisation.
Tip: We recommend connecting the tumble dryer to the power supply via a plug and
socket so that it is easier to conduct electrical safety checks (e.g. during maintenance or
repair work).
The tumble dryer must not be connected to devices such as timers which would switch
it off automatically.
If it is necessary to install a residual current device (RCD) in accordance with local regu-
lations, a residual current device type B (sensitive to universal current) must be used.
Supply air/exhaust air
The tumble dryer may only be operated when the ducting has been connected and the
room is sufficiently ventilated (see installation instructions).
Steam connection (only for steam-heated variants)
The steam connection must only be carried out by a registered installation technician. The
enclosed installation instructions must be observed as they are important for the steam
connection.
Hot water connection (only for hot water-heated variants)
The hot water connection may only be carried out by a registered installation technician.
The installation instructions must be observed as they are important for the hot water con-
nection.
If a stopcock is desired, it must be fitted on site.
Gas connection (only for gas-heated variants)
The gas connection must only be carried out by a registered installation technician in ac-
cordance with the applicable national regulations (see installation instructions).
The use of a gas socket is not permitted at the specified heater rating as the flow rate is
too low.
The gas heating is configured at the factory in line with the gas specifications on the
sticker on the rear of the appliance.
If the gas family is changed, a conversion kit must be requested from the Miele Cus-
tomer Service Department (please specify the appliance type, serial number, gas family,
gas group, gas connection pressure and country of installation). Follow the installation in-
structions. This conversion may only be carried out by a registered specialist.
32