360 YIELD CENTER 360 Y-DROP Montagehandleiding - Pagina 5
Blader online of download pdf Montagehandleiding voor {categorie_naam} 360 YIELD CENTER 360 Y-DROP. 360 YIELD CENTER 360 Y-DROP 17 pagina's. Case 80'/90' boom
3.
Install remainder of the mounting brackets in Zones 2 through 5
and leave loose, shown in FIG 3:
1.
One (1) 6" z-slider bracket
2.
Two (2) 5" plates
3.
Two (2) 3/8" x 4" bolts
4.
Four (4) 3/8" flat washers
5.
Two (2) 3/8" lock washers
6.
Two (2) 3/8" nuts
4.
Space all five sets of mount brackets nominally 60" apart, fold
boom to check clearances and tighten. Distances between
brackets may vary, depending on your specific boom. Be sure to
take into account where your drops will fall.
5.
Repeat STEPS 2 - 4 on the other boom fold.
6.
Install two (2) mounting brackets on center section and tighten,
right side is shown in FIG 4a, 4b & 4c:
1.
Two (2) 6" z-slider brackets
2.
Four (4) 6" plates
3.
Four (4) 4.5" bolts
4.
Eight (8) 3/8" flat washers
5.
Four (4) 3/8" lock washers
6.
Four (4) 3/8" nuts
5"
p late
FIG
3
6"
z -‐slider
6"
z -‐slider
FIG
4 a
6"
t op
p late