BIOMICROBICS BioBarrier 0.5-N Installatiehandleiding - Pagina 5
Blader online of download pdf Installatiehandleiding voor {categorie_naam} BIOMICROBICS BioBarrier 0.5-N. BIOMICROBICS BioBarrier 0.5-N 13 pagina's. For use with nsf/ansi std. 40 class i/std. 350 class r,
ansi/nsf std. 245
Ook voor BIOMICROBICS BioBarrier 0.5-N: Gebruikershandleiding (7 pagina's)
INITIAL CONNECTIONS
the tank.
6. Screw the provided 2" Ø PVC MPT x slip fitting into the air line grid.
7.
Measure the depth of the tank from the bottom to the top of the tank manhole. Cut one section of 2" Ø PVC
schedule 40 pipe [51 mm] for the air line and two sections of schedule 80 ¾" [19 mm], for bracing the system,
to this length.
AIR LINE
13. In the manhole, make connections so that the BioBarrier air line exits the tank for connection to the blower.
The air line must be firmly secured to the tank to prevent vibrational breakage.
14.
From the blower, run 2" [51 mm] schedule 40 PVC piping to the connection point at the treatment tank. Make
sure pipe union is installed as shown and that all connections are permanent. This line may not exceed 40 ft
[12 m] in total length. DO NOT use any more than four elbows in this line.
15. At the blower, use the supplied fittings to connect the inlet filter assembly and initial outlet piping.
Steps 6 -10 are best performed prior to placing the module in
8.
Solvent weld the 2" air line to the BioBarrier's
air line connection.
9.
Use the supplied stainless steel bolts and
nuts to secure the ¾" pipes to the top of the BioBarrier
housing at the provided recesses.
10.
Make the initial discharge line connections by
attaching a piece of 5/16" [8 mm] tubing to the water
discharge port of the BioBarrier's pump. Make sure
this length of tubing is long enough to reach the tank
exit once the unit is placed in the tank.
11.
For BioBarrier 0.5, 1.0, 1.5 ONLY - Attach the
¾" schedule 40 (or schd 80) pipe for the discharge
pump vent to the supplied discharge assembly. Make
sure the piping is long enough to reach into the air
space in the tank's manhole. Water MUST NEVER
enter this vent pipe (see step 15 pic).
12.
Using the supplied lifting cables, lower the
BioBarrier unit into the treatment tank and postion the
unit so that it is directly under the manhole.