Axometrics AXOSTEP-APM-65 Installatiehandleiding - Pagina 10
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Axometrics AXOSTEP-APM-65. Axometrics AXOSTEP-APM-65 17 pagina's. Axostep panel mapper for 65’’ horizontal samples
4
Operator Station
4.1
Mounting the monitor
1. Route the monitor cables through the cable hole on the front panel and plug them in the monitor.
2. Now using the 4 screws in the back of the monitor, mount the monitor to the panel. Refer to
figures 11 and 12.
Fig. 11
Monitor cables
4.2
Mounting the Signal Tower
1. Install the signal tower on top of the machine just above the monitor.
2. Once the signal tower is mounted, plug the connector to the signal tower cable. Refer to figure
13.
Fig.12
Do not over tighten the screws in
the back of the monitor
7