Creek Company ODC XR 10 Montagehandleiding - Pagina 2

Blader online of download pdf Montagehandleiding voor {categorie_naam} Creek Company ODC XR 10. Creek Company ODC XR 10 6 pagina's.

I.
PADDED SEAT ASSEMBLY
1. Assemble Seat Back to Seat Bottom using Seat Pins (see figure 1).
II.

FRAME ASSEMBLY

NOTE: Your frame assembles using (10 ) Short Snap Pins and (4) Seat Screws for seat installation. Please fol-
low instructions accordingly. See figure 3 for Snap Pin installation.
1. Assemble Seat to Seat Support Frame Member using 4 Seat Screws (see figure 1).
2. Assemble Seat Support Member to Left and Right Frame Members using (4) Short Snap Pins (see figure 4).
3. Assemble U-Bar to back of Left and Right Frame Member, using (2) Short Snap Pins (see figure 4).
4. Remove Protective Support Bar and assemble Cargo Deck to back of Left and Right Frame Member using (2) Short
Snap Pins (see figure 4)
5. Assemble Foot Bars to front of Left and Right Frame Member (see figure 4).
6. See figure 9 and 11 for use of Underseat Lift and Lock Anchor System.
III.
PONTOON INFLATION
NOTE: Use the large cone adapter provided with your pump. See figure 7 for a detail of the
valve assembly. Before inflation, be sure to fully seat each valve assembly into the
pontoon, screwing tightly by hand. When fully seating valve assembly, be sure that the
valve plate is in place around valve assembly and not restricting the valve assembly from
a full seal. After inflating, be sure to fully seat the top cap on to each valve assembly,
screwing tightly by hand. Both are required for an airtight seal.
1. Inflate each pontoon. The valve is located at the top center of each Pontoon (see figure 5).
Inflate until firm (do not over inflate).
2. Again, be sure top valve cap and valve assembly are fully seated to achieve airtight seal.
PONTOON DEFLATION: Unscrew entire valve assembly from pontoon.
IV. ATTACH PONTOONS TO FRAME
NOTE: Always inflate Pontoons first, before attaching to frame.
1. Position inflated Pontoons under the Left and Right Frame Members with ODC XR10
the outside.
2. Attach each Pontoon to frame using (8) Cam Lock Straps. Slip each strap through D-Ring on Pontoon, around
frame and pull tight through Cam Lock Buckle. NOTE: Be sure the straps are pulled tight through the
Cam Lock Buckles (see figure 6).
V. OAR & OARLOCK ASSEMBLY
1. Slide the Oar Stop over the handle end of the Oar Shaft and tighten Oar Stops with nut and bolt provided.
2. Assemble 2 Oar Shaft pieces and Blades.
3. Place Oarlock Bushing over Oarlock shaft and place Oarlock into frame. Frame has 3 Oarlock postions for a
custom fit. Attach split ring at end of Oarlock shaft to secure Oarlock in place (see figure 8)
ODC XR 10
O O U U T T D D O O O O R R D D I I S S C C O O V V E E R R Y Y C C R R A A F F T T
ASSEMBLY INSTRUCTIONS
T T M M
T T M M
logo oriented to