Siemens SIWAREX WL230 BB-S SA Uitrustingshandleiding - Pagina 16

Blader online of download pdf Uitrustingshandleiding voor {categorie_naam} Siemens SIWAREX WL230 BB-S SA. Siemens SIWAREX WL230 BB-S SA 50 pagina's. Base plate and elastomer bearing bb-s sa
Ook voor Siemens SIWAREX WL230 BB-S SA: Handmatig (36 pagina's), Gebruiksaanwijzing (48 pagina's), Gebruiksaanwijzing (44 pagina's)

Siemens SIWAREX WL230 BB-S SA Uitrustingshandleiding
Description
3.3 Principle of operation
Figure 3-3
Prior to installation, the load cell is inserted with the pendulum bolt enclosure and the pendulum
bolt into the compact mounting unit. The load cell is secured with 2 hexagon bolts in its position.
Then the complete unit is installed in the scales. Compensate angular and/or flatness errors as
well as differences in height between the brackets using compensation plates. Make sure that
the connection plates are not tensioned and that the base/top plates are not concave in the
center. The compact mounting units are optimally aligned when screwed tight. The load cells are
not yet loaded.
Figure 3-4
Finally, the load bearing implement is lowered by loosening the two upper hexagon nuts under
the top plate. The top plate with pressure piece is lowered onto the load cell. The weight now
rests on the load cells.
16
Pre-assembled compact mounting unit
Installation state
Equipment Manual, 12/2020, A5E02390707B-03
SB-S SA