Cisco ACS-GSR-LCCBLM Handleiding voor installatie-instructies - Pagina 2
Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Cisco ACS-GSR-LCCBLM. Cisco ACS-GSR-LCCBLM 14 pagina's. Gigabit switch router cablemanagement kit
Product Overview
Figure 1
Top blower module
(behind front cover)
Bottom blower module
(behind front cover)
The lower card cage, located behind the air filter, has five horizontal slots for switch fabric cards.
Below the lower card cage is a power supply bay. Up to four AC-input power supplies or two
DC-input power supplies can be installed in the bay.
A cable-management system manages the line card interface cables in the upper card cage, keeping
them organized and free from sharp bends, which can degrade cable performance. The Cisco 12012
cable-management system consists of two components: a horizontal cable-management tray, which
is attached to the frame directly above the upper card cage, and a vertical cable-management bracket,
which is attached to each line card. (Refer to Figure 2.)
The horizontal cable-management tray keeps the interface cables organized by upper card cage slot
and free of sharp bends as the cables enter the Cisco 12012 from either the left or right side and are
routed to the individual line cards.
2 Cisco 12012 Gigabit Switch Router Cable- Management Kit Installation Instructions
Cisco 12012—Front View
Upper card cage
Air filter tray
Power supply bay
OUTPUT
200 -240V
INPUT:
~
10 A
INPUT:
~
50/60 HZ
200 -240V
INPUT:
~
2000 W
50/60 HZ
10 A
200 - 240V
INPUT:
~
2000 W
10 A
200 - 240V
2000 W
50/60 HZ
10 A
50/60 HZ
2000 W
AC
OK
AC
OK
AC
OK
AC
FAIL
OUTPUT
OK
FAIL
OUTPUT
FAIL
OUTPUT
FAIL
Frame
Lower card cage
(behind air filter)