Cisco UCS B250 M1 Installatie en onderhoud - Pagina 16
Blader online of download pdf Installatie en onderhoud voor {categorie_naam} Cisco UCS B250 M1. Cisco UCS B250 M1 34 pagina's. Extended memory blade server
Installing and Removing the B250 M2 Air Baffle
S e n d d o c u m e n t c o m m e n t s t o u c s - d o c f e e d b a c k @ c i s c o . c o m
configured with a single CPU. Cisco UCS B250 M1 servers shipped beginning July 2010 and all Cisco
UCS B250 M2 servers are automatically shipped with a baffle pre-installed. Installation requires no tools
and is shown in
to work together optimally.
Figure 7
Carefully place the air baffle (provided through the field upgrade kit) so that two alignment holes will
Step 4
align with and are engaged with the top of the standoffs.
Replace the top cover onto the enclosure of the UCS B250 Blade Server.
Step 5
Cisco UCS B250 Extended Memory Blade Server Installation and Service Note
16
Figure
7. The baffle provides needed back pressure that allows the fans and heat sinks
Air Baffle (N20-BBFLB) Installation
OL-22474-03