Acuity nLight Snelstarthandleiding - Pagina 4

Blader online of download pdf Snelstarthandleiding voor {categorie_naam} Acuity nLight. Acuity nLight 4 pagina's. Digital time clock

nLight® Digital Time Clock (DTC)
Quick Start Guide
Creating a Holiday Schedule
1
Tap the login keypad and enter the administrator PIN.
3
Add Holiday Schedule allows the creation of a new holiday schedule. Enter a Schedule Name (required), then select Runs On to select from a list
of major US holidays, or create a New Custom Event to define a custom holiday.
4
Start Trigger is the first action that executes when the schedule is started and is required for a schedule to run. Select a time within the schedule's
date(s) when the start event should begin. Users will also be able to Set Light Levels to either channels or individual output devices connected to the
lighting control zone. Inputs devices can be enabled, or disabled, through the Enable/Disable Switches and Enable/Disable Sensors.
5
End Trigger is the last action that executes when a schedule is concluding. Unlike the start trigger, the end trigger is optional. Users have the option
to set the Action to Do Nothing. By selecting this option, the actions of the start event will continue past the schedule's end date, unless overwritten
byanother schedule's actions.
Acuity Brands | One Lithonia Way Conyers, GA 30012 Phone: 800.535.2465 www.acuitybrands.com © 2019 Acuity Brands Lighting, Inc. All rights reserved. Rev. 5/23/2020
2
Navigate to the Schedules dashboard. Tap on the Holiday tab, then selectthe
option to Add Holiday Schedule.
4 of 4