Cisco S195 Aan de slag handleiding - Pagina 11

Blader online of download pdf Aan de slag handleiding voor {categorie_naam} Cisco S195. Cisco S195 18 pagina's. Web security appliance
Ook voor Cisco S195: Handmatig (24 pagina's), Hardware installatiehandleiding (50 pagina's)

Cisco S195 Aan de slag handleiding
1
Management port (M1) - (192.168.42.42)
3
Traffic monitor port (T1)
5
Internet
Power up the appliance by pressing the On/Off switch on the front panel of the appliance. You must
Step 5
wait 10 minutes for the system to initialize each time you power up the system. After the appliance
powers up, a solid green light on the front panel indicates that the appliance is operational.
Wait at least 10 minutes for the system to complete the power up sequence and the LEDs to turn green.
Caution
If you turn the power off before the initialization is complete, the appliance will not reach an operational
state and must be returned to Cisco.
If turned on quickly after connecting power to the appliance, the appliance powers up, the fans spin and
Note
the LEDs turn on. Within 30-60 seconds, the fans stop and all LEDs turn off. The appliance powers on
31 seconds later. This behavior is by design to allow the system firmware and controller to synchronize.
See the
AsyncOS for Cisco Web Security Appliances User Guide
Step 6
2
4
Cisco Web Security Appliance S195, S395, S695, and S695F Getting Started Guide
Connect to the Appliance
Management computer (192.168.42.43)
WAN modem
for further configuration.
11