Acuity Controls ECLYPSE A1000 Installatiehandleiding - Pagina 3
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Acuity Controls ECLYPSE A1000. Acuity Controls ECLYPSE A1000 14 pagina's. Asset tracking
Ook voor Acuity Controls ECLYPSE A1000: Installatiehandleiding (10 pagina's)
1-0 Introduction
1-1 Product Description
This document describes the installation procedures for the ECLYPSE A1000. The ECLYPSE A1000 manages and controls a network of enabled with Atrius
luminaires part of the Atrius Navigator Solution. This programmable device provides advanced functionality, such as customizable IP and WiFi to let you
seamlessly integrate your lighting control system with your building management systems. For more detailed information about the ECLYPSE A1000 and
its capabilities please refer to the ECLYPSE A1000 User Guide.
1-2 General Installation Requirements
For proper installation and subsequent operation of the nLight
Unified Room Interface solution, pay special attention to the following
recommendations:
•
Upon unpacking the product, inspect the contents of the carton
for shipping damages. Do not install damaged modules.
•
Avoid areas where corroding, deteriorating or explosive vapors,
fumes or gases may be present.
•
Ensure the mounting surface can support the controller, DIN rail,
and any user-supplied enclosure.
•
Allow for proper clearance around the controller's enclosure,
and wiring terminals to provide easy access for hardware
configuration and maintenance, and to ventilate heat generated
by the controller.
•
The controller's mounting orientation must be horizontal with
the controller's back attached to a vertical wall surface. Orient
the controller with the ventilation slots and power supply input
terminal block connectors towards the top to permit proper
heat dissipation. When installed in an enclosure, select one that
provides sufficient surface area to dissipate the heat generated by
the controller and by any other devices installed in the enclosure.
A metal enclosure is preferred. If necessary, provide active cooling
for the enclosure.
•
The controller's datasheet specifies the power consumption
(amount of heat generated), the operating temperature range,
and other environmental conditions the controller is designed to
operate under.
•
Ensure that all equipment is installed according to local, regional,
and national regulations.
•
If the controller is used and/or installed in a manner not specified
by Acuity Controls, the functionality and the protection provided
by the controller may be impaired.
Any type of modification to any nLight
product will void the product's warranty.
Take reasonable precautions to prevent electrostatic
discharges to the controller when installing, servicing,
or operating the controller. Discharge accumulated
static electricity by touching one's hand to a well-
grounded object before working with the controller.
Acuity Brands | One Lithonia Way Conyers, GA 30012 Phone: 800.535.2465 www.acuitybrands.com © 2019 Acuity Brands Lighting, Inc. All rights reserved. Rev. 11/07/2019
1-3 Device Markings (Symbols)
Certain markings (symbols) can be found on the controller and are defined
as follows:
Symbol
Description
CE marking: the device conforms to the
requirements of applicable EC directives.
Double Insulation marking: These controllers are
built using double insulation.
Products must be disposed of at the end of their
useful life according to local regulations.
Read the Hardware Installation Guide for more
information.
For indoor use only.
UL marking: conforms to the requirements of the UL
certification.
FCC marking: This device complies with FCC rules
part 15, subpart B, class B.
Warning Symbol: Significant information required.
Refer to the Hardware Installation Guide.
HIGH VOLTAGE Symbol: Direct contact will cause
electrical shock or burn.
Alternating Current
Direct Current
Line
Neutral
3 of 14