Acolyte NEONLYTE Installatiehandleiding - Pagina 7

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Acolyte NEONLYTE. Acolyte NEONLYTE 9 pagina's.
Ook voor Acolyte NEONLYTE: Installatiehandleiding (4 pagina's)

Step 4 – secure the Neonlyte and flexible channel to a solid structure
using the mounting clips provided ensuring clip spacing is every 24
inches/2ft
Step 5 – Connect feed cable to power supply, switch on breaker and
test.
7