Whirlpool WGD96HEAW Handleiding voor installatie-instructies - Pagina 4
Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Whirlpool WGD96HEAW. Whirlpool WGD96HEAW 44 pagina's. 7.4 cu. ft. duet steam gas dryer with advanced moisture sensing
Ook voor Whirlpool WGD96HEAW: Gebruiksaanwijzing (8 pagina's), Gebruiks- en onderhoudshandleiding (40 pagina's)
INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Flat-blade screwdriver
1/4" and 5/16" nut driver
(recommended)
Tape measure
Utility knife
Caulking gun and compound
(new vent installations)
Tools needed for gas installations:
8" or 10" pipe wrench
Pipe-joint compound
resistant to LP gas
4
#2 Phillips screwdriver
Level
Pliers
Tin snips (new vent installations)
Adjustable wrench that opens to
1" (25 mm) or hex-head socket wrench
8" or 10" adjustable wrench
(for gas connections)
Parts supplied (all models):
Leveling legs (4)
Parts supplied (steam models):
"Y" connector
Parts package is located in dryer drum. Check that all parts
are included.
NOTE: Do not use leveling legs supplied with dryer if installing
with a pedestal or a stack kit.
Parts needed:
(Not supplied with dryer)
Vent clamps
■
Vent elbows and vent work
■
Parts needed (steam models):
2' (0.6 m) inlet hose
Additional parts may be required, depending in your installation.
Check local codes. Check existing electrical supply and venting.
Read "Electrical Requirements" and "Venting Requirements"
before purchasing parts.
Optional Equipment:
(Not supplied with dryer)
Refer to your "Use and Care Guide" for information about
accessories available for your dryer.
5' (1.52 m) inlet hose
and rubber washer