ErgoCentric upCentric Power & Data Rail Handmatig - Pagina 18

Blader online of download pdf Handmatig voor {categorie_naam} ErgoCentric upCentric Power & Data Rail. ErgoCentric upCentric Power & Data Rail 19 pagina's.

Installation Guide
upCentric Power & Data Rail

Finishing the Assembly

Step 9: Install Cover Panels
a) Run wires through openings in the Voice/Data Plate (H) in the cover panel, then reinstall the cover panel.
b) Use adaptors from VGA adaptor Kits (F) to fit ethernet cable ends into the Voice/Data Plate.
c) Cover all unused data port windows with solid window covers from VGA kits
Step 10: Installing Leg Caps:
Install the leg caps to provide a finished appearance and protection to the leg ends.
upCentric Power & Data Rail | Installation Guide
Leg caps
18