Zanussi ZGF 646 Bedienings- en installatiehandleiding - Pagina 7

Blader online of download pdf Bedienings- en installatiehandleiding voor {categorie_naam} Zanussi ZGF 646. Zanussi ZGF 646 12 pagina's. Gas hobs

Zanussi ZGF 646 Bedienings- en installatiehandleiding

7. Electrical Connection

The appliance is designed to be connected to 230 V
monophase electricity supply.
The connection must be carried out in compliance with
the laws and regulations in force.
Before the appliance is connected:
1) check that the main fuse and the domestic installation
can support the load (see the rating label);
2) check that the power supply is properly earthed in
compliance with the current rules;
3) check the socket or the double pole switch used for
the electrical connection can be easily reached with
the appliance built in the forniture unit.
Connect the plug, able to support the load marked on
the identification plate, to the cable, following the
recommendation given in Fig. 7. The plug has to be
fitted in a proper socket.
If connecting the appliance directly to the electric system,
it is necessary that you install a double pole switch
between the appliance and the electricity supply, with a
minimum gap of 3 mm. between the switch contacts and
of a type suitable for the required load in compliance
with the current rules.
The earth cable (yellow/green) must not be interrupted
by the interrupter.
The connection cable has to be placed in order that, in
each part, it cannot reach a temperature 90 C higher
than the room temperature.
The brown coloured phase cable (fitted in the terminal
block contact marked with "L") must always be connected
to the network phase.
REPLACEMENT OF THE VOLTAGE CABLE
The connection of the voltage cable to the appliance's
terminal block is of type "Y". This means that its
replacement requires the specific equipment of a
technician.
In this case, only cable type H05V
used. The cable section must be suitable to the voltage
and the working temperature.
The yellow/green earth wire must be approximately 2
cm. longer than the phase wires (Fig 7).
After connection try out the heating elements allowing
them to function for approximately 3 minutes.
To open the terminal block and reach the terminals,
proceed as follows:
insert the point of a screwdriver into the visible
protrunding part of the terminal block;
exert a light pressure and lift (Fig. 8)
V
-F T90 must be
2
2
Earth (yellow/green)
FO 0073
FO 0257
Neutral
Fig. 7
Fig. 8
7