Blackberry RADAR-M ITA100-1 Installatiehandleiding - Pagina 7

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Blackberry RADAR-M ITA100-1. Blackberry RADAR-M ITA100-1 39 pagina's. Container, dry van, insulated trailers barn doors
Ook voor Blackberry RADAR-M ITA100-1: Installatiehandleiding (27 pagina's), Installatiehandleiding (36 pagina's)

Blackberry RADAR-M ITA100-1 Installatiehandleiding
BLACKBERRY RADAR ITA100-1 CHASSIS BRACKET INSTALLATION GUIDE 7
7. In the Configure Columns area, Data Field lists the data fields required for adding
assets, and CSV Field Header allows you to select the headers used in the CSV file
that match the data fields. In each dropdown list under CSV Field Header, select the
header name that matches the data field on the left.
The image below shows the CSV upload screen after the data fields have been matched
to the CSV field headers in the sample CSV file above.
8. Click Process CSV File.
When processing is complete, a summary of the operation is displayed. The following
image shows the summary of a successful CSV operation.