Aleko ARVAW010 Handleiding voor installatie-instructies - Pagina 6

Blader online of download pdf Handleiding voor installatie-instructies voor {categorie_naam} Aleko ARVAW010. Aleko ARVAW010 8 pagina's. Multi-functional rv/patioawning

Step.9
Connect the right arm
1.Turn down the Safety-spring lock according to the PIC marked direction
(On and ONLY the RIGHT side of the fabric tube,there is a Safety-spring lock)
2.Make Pre-stress for right side spring by turn the sping ending stick with
clamp/screw driver fully turn 15 turns according to pic marked diretion
3.Connect the tube with arm,see pic
Connect the left arm
1.Make Pre-stress for Left side sping by turn the sping ending stick with screw
driver/clamp fully turn 15 turns accoring to pic marked direction
2.After doing the pre-stressing,please DO NOT LOOSE the clamp/screw,until
the left arm is connected safely
P.10
ALEKO
Step.10
Turn up the safety-spring lock according the
ATTENTION
By now,installation step is done,please double check the
awning and keep awning twoside spring tension are the sa
me,and in a state of equilibrium.
pic marked direction
Step.11
Pull to close the awning.
P.11