CTEK CGC Series Installatiehandleiding - Pagina 6

Blader online of download pdf Installatiehandleiding voor {categorie_naam} CTEK CGC Series. CTEK CGC Series 8 pagina's.

Cable installation – power
2.7.4
The CGC100 is supplied with 230VAC. The
input power should be connected to an internal
terminal block.
Because the unit is connected to the power
grid, installation must be performed by a
certified electrician.
3 Installation
3.1
Step by step
1. Cable installation.
a. Choose the installation points for
the sub-unit, charging stations and
Ethernet switch.
b. Install the electrical and Ethernet
cables.
c. Install the current transformers in a
location where other loads are to
be measured.
2. Install the units
a. Screw the CHARGESTORM®
Connected units to a wall or a post
and connect the Ethernet cables.
b. Connect the phases alternately on
each charging box. Carefully note
down the phase rotation, which
must be known when the load
balancing is configured in the
software. Documentation
regarding the phase rotation is
sometimes available in advance.
c. Install the sub-unit, CGC100 and
connect the cables.
3. Connect the power.
a. Check the installation before
switching on the power to prevent
the risk of short-circuiting.
b. After the power is switched on, the
charging station should
automatically switch on and a
green indicator light will illuminate.
4. Configure the load balancing:
a. Configure each individual charging
box via the mini USB interface so
that NanoGrid is activated. Verify
that the firmware version is R3.6.1
or higher. Remember to reboot
CTEK E-Mobility
Figure 1 Activate NanoGrid
Figure 2 Reboot
Figure 3 Load nanogrid.ini file
5. Option: Internet connection to Charge
Portal
3.2
3.2.1
Customers can access their electrical vehicle
charging statistics via the Internet using
CHARGESTORM® Connected cloud-based
Charge Portal. To access Charge Portal, the
www.ctekemobility.com
CGC100 MANUAL
after changing the configuration
(See manual ref. 1) how to
connect to the local web interface)
b. Configure CGC100 via the mini
USB interface. Activate NanoGrid.
Upload NanoGrid.ini. Reboot. For
a description of the load balancing
file NanoGrid.ini see ref. 3)
a. See next section
Options
Internet connection Charge Portal
Page 6 (8)