Aerco Esteem 399 Producthandleiding - Pagina 10

Blader online of download pdf Producthandleiding voor {categorie_naam} Aerco Esteem 399. Aerco Esteem 399 14 pagina's. Low nox gas fired boiler

Vent/Air System Joint Assembly
WARNING!
D
O NOT OVER TIGHTEN THE SELF
. U
SCREWS
SE A LOW TORQUE SCREW DRIVE
TO PREVENT STRIPPING OUT THE HOLES
HOLE BECOMES STRIPPED
SCREW NO LONGER THAN
.
RIVET MAY BE USED
Outer Jacket
Bead
Male End
Lever
Note: Secure outer sections together where they
overlap with 2 self-drilling screws provided, 90º
apart using low torque setting of driver.
Figure 7: Vent Joint Assembly
6
-
DRILLING
. I
F A
,
A LARGER DIAMETER
1/2"
OR A SHORT POP
Female
End
Clamp
Inner Pipe
Gasket
6. Seal the two components together by
placing a clamp over the connection and
pressing down on the clamp lever. The
clamp should be centered over the con-
nection and the edge of the clamp should
cover the beads on the end of each com-
ponent. If the clamp does not cover and
lock onto the component jacket beads,
ensure the components are fully pressed
together and interlocked
WARNING!
I
T IS VERY IMPORTANT THAT THE CLAMP BE
PROPERLY INSTALLED
CONNECT THE VENT COMPONENTS COULD LEAD
TO VENT FAILURE AND CAN RESULT IN DEATH
SERIOUS INJURY OR SUBSTANTIAL PROPERTY
.
DAMAGE
. F
AILURE TO PROPERLY
GF-125V
,