Armstrong Rada 320D Installatie- en onderhoudshandleiding - Pagina 11

Blader online of download pdf Installatie- en onderhoudshandleiding voor {categorie_naam} Armstrong Rada 320D. Armstrong Rada 320D 20 pagina's. Water temperature controls groups of fixtures - thermostatic
Ook voor Armstrong Rada 320D: Installatie- en onderhoudshandleiding (12 pagina's), Installatie- en onderhoudshandleiding (20 pagina's)

Armstrong Rada 320D Installatie- en onderhoudshandleiding
Step 5
Model 320 must be installed in a standard HOT-LEFT/COLD-RIGHT inlet supply configuration.
There are red (hot) and blue (cold) markings on each valve.
The inlet supplies must always match the corresponding inlet ports on the valve.
Step 6
a. Fully tighten all of the pipes using an adjustable spanner.
Caution! Use a soft cloth to cover the plating from
damage while tigtening with spanner.
Step 7
a. Turn on the water supply and ensure that there are
no leaks.
11