Acorn Safety S0860-RH Instructies voor installatie, bediening en onderhoud - Pagina 2
Blader online of download pdf Instructies voor installatie, bediening en onderhoud voor {categorie_naam} Acorn Safety S0860-RH. Acorn Safety S0860-RH 5 pagina's. Eyewash/facewash
Installation & Operation Manual
PRELIMINARY STEPS
1. Read the installation instructions prior to beginning the installation.
2. Separate parts from packaging and verify all necessary parts are accounted for and undamaged. Obtain missing or
damaged parts from Acorn Safety prior to beginning installation. See page 4.
3. Flush water supply line prior to installation. This will remove unwanted debris from the lines and prevent unwanted
blockages in the safety equipment.
4. In order to comply with ANSI Z358.1, the safety equipment must be inspected periodically. An inspection tag is
provided for documentation purposes.
5. All employees at risk of eye contamination should be informed and trained in the use of this and any other safety
equipment. The signage provided should be posted appropriately in close proximity as required by ANSI and
OSHA.
ROUGH-IN
5 5 8 "
(143)
Acorn Safety
a division of Acorn Engineering Company™
Manual #7109-400-001
2 1 2 "
(64)
16 1 4 "
(413)
100°"
2"
(51)
1/2" NPT
SUPPLY
SUPPLY
Ø 1 2 "
3 1 8 "
(13)
NPT SUPPLY
(79)
4 7 8 "
(124)
2 1 2 "
(63)
SUPPLY
20 1 8 "
(511)
5"
(127)
3 1 2 "
(89)
Page 2 of 5
Ø2"
(51)
4X Ø1/4"-20
(6)
TAPPPED
HOLE
MOUNTING DETAIL
Revised: 01/07/2013