3D Systems ProJet MJP 5600 Originele handleiding - Pagina 11

Blader online of download pdf Originele handleiding voor {categorie_naam} 3D Systems ProJet MJP 5600. 3D Systems ProJet MJP 5600 18 pagina's.

Preparation for Shipment Arrival
The following topics should be arranged PRIOR TO THE ARRIVAL OF THE SYSTEM, to simplify installation
®
of the ProJet
5600 Printing Systems. Refer to later sections of this guide for details of this procedure.
Make sure the following resources are available:
____ A forklift or similar, heavy-duty equipment required for unloading the printer crate from the
truck to the location where it will be uncrated and installed.
____ Network connection(s)
____ Hard wire power outlet(s) - a dedicated circuit to power the printer
____ Optional UPS (customer purchased) 5kVA minimum properly wired for input and output
voltages to operate the machine at designated voltages.
____ Storage for extra printer material containers and other consumables
____ At least one (1), networked graphics workstation or CAD/CAM/CAE terminal meeting the
requirements described in Client Workstation Requirements.
Note: Retain the shipping crate, brackets and hardware in case the ProJet™ Professional Printing
System needs to be shipped back to the manufacturer for repair. These crates are designed to
allow fast, easy removal and packaging of the product. If printer needs to be return to the
manufacturer, contact 3D Systems
Customer Support
for shipping instructions.