CleaverBrooks ClearFire SFH Opstarthandleiding - Pagina 2
Blader online of download pdf Opstarthandleiding voor {categorie_naam} CleaverBrooks ClearFire SFH. CleaverBrooks ClearFire SFH 14 pagina's. Horizontal steam boiler
CFH Startup Guide
WARNING
! DANGER
Improper installation, adjustment, service, or main-
tenance can cause equipment damage, personal
injury, or death. Refer to the Operation and Mainte-
nance manual provided with the boiler.
WARNING
! DANGER
To minimize the possibility of serious personal injury,
fire or damage to the equipment, never violate the fol-
lowing safety rules.
— Always keep the area around the boiler free of com-
bustible materials, gasoline, and other flammable liq-
uids and vapors
— Never cover the boiler, lean anything against it,
stand on it, or in any way block the flow of fresh air to
the boiler.
NOTE to equipment owners, operators, and maintenance
personnel: This guide is not a short-cut to safe and effi-
cient boiler operation. Operating an improperly commis-
sioned boiler can result in increased fuel costs and may
shorten the life of the equipment or produce a hazardous
condition. All personnel involved in operating or main-
taining the boiler should read the manual in its entirety.
Refer to CFH Operation and Maintenance Manual -
CB Part Number 750-295
2
WARNING
! DANGER
Be sure the fuel supply which the boiler was de-
signed to operate on is the same type as specified
on the boiler name plate.
! DANGER
WARNING
Should overheating occur or the gas supply valve fail
to shut off, do not turn off or disconnect the electrical
supply to the boiler. Instead turn off the gas supply at
a location external to the boiler.
WARNING
! DANGER
Do not use this boiler if any part has been under
water. Immediately call your Cleaver-Brooks service
representative to inspect the boiler and to replace
any part of the control system and any gas control
which has been under water.
! DANGER
WARNING
The installation must conform to the requirements
of the authority having jurisdiction or, in the ab-
sence of such requirements, to UL 795 Commer-
cial-Industrial Gas Heating Equipment and/or the
National Fuel Gas Code, ANSI Z223.1
WARNING
! DANGER
The boiler and its individual shutoff valve must be
disconnected from the gas supply piping system
during any pressure testing of that system at test
pressures in excess of 1/2 psi (3.5 kPa).
WARNING
! DANGER
The boiler and its gas connection must be
leak tested before placing the boiler in
operation.
Notice
Where required by the authority having jurisdic-
tion, the installation must conform to the Standard
for Controls and Safety Devices for Automatically
Fired Boilers, ANSI/ASME CSD-1.
Part No. 750-293