AKKU SYS a-TroniX 1kVA-EBP Gebruikershandleiding - Pagina 9

Blader online of download pdf Gebruikershandleiding voor {categorie_naam} AKKU SYS a-TroniX 1kVA-EBP. AKKU SYS a-TroniX 1kVA-EBP 12 pagina's. Extended battery pack 24v, 48v, 72v

AKKU SYS a-TroniX 1kVA-EBP Gebruikershandleiding
User Manual
Extended Battery Pack 1kVA, 2kVA, 3kVA

5. Maintenance

Replacing Batteries
NOTE:
DO NOT DISCONNECT the batteries while the UPS is in battery mode.
THE EBP can be replaced when the UPS in ON, but be aware that if the utility
fails at that time, the load of the UPS may NOT be protected.
If you prefer to remove input power to change the batteries, see „UPS start up
and turn off" in the user manual of UPS.
WARNING:
Servicing has to be performed by qualified service personnel knowledgeable
of batteries and required precautions. Keep unauthorized personnel away
from batteries.
Batteries can present a risk of electrical shock or bum from high short circuit
current. Observe the following precautions:
1) Remove watches, rings or other metal objects;
2) Use tools with insulated handles;
3) Do not lay tools or metal parts on top of batteries,
4) Wear rubber gloves and boots
When replacing batteries, replace with the same type and number of
batteries or battery packs. Proper disposal of batteries is required.
Use the service of our AkkuSys team to order new batteries.
The batteries must be disposed of properly.
For more information, contact us on the hotline +49 4101/376760,
at
Refer to your local codes for disposal requirements.
Replacing Tower EBPs
CAUTION:
The EBP is heavy.
Lifting the cabinet requires a minimum of two people.
Replace the EBPs:
Unplug the EBP cable from the UPS. If additional EBPs are installed, unplug
the EBP cable from the battery connector on each EBP.
Replace the EBP(s). See „Recycling the used battery or UPS for proper
disposal.
09/2021
or use the QR-code:
Page 9