Artopex downtown Installatiehandleiding - Pagina 12

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Artopex downtown. Artopex downtown 13 pagina's.

downtown

MOBILE PANELS

Legs

The installation of legs is the same for all mobile panels.
Marker board
Communication
panel
Step 1 :
Align and screw the nut and washer using the pre-drilled holes
under the metal structure.
Step 2 :
Install casters.
Allen key
12

Communication panel

Step 1 :
Install the metal shelf. Screw the shelf using the pre-drilled holes
in the metal structure. Then, screw the cable conduit under the
shelf.
Panel with Downtown
Connection system
Step 2 :
Remove the back panel and install the double electrical outlet and
manage the monitor cable
- Remove the metal top cap of the mobile panel.
- Lift the panel and remove it.
Step 3 :
Install the electrical outlet.
Step 4 :
Remove the cover of the cable conduit. Place the electrical outlet
cable in the cable conduit and plug it into the power bar.
Repeat the steps for the monitor cable.
Installation guide
Attach the shelf
Front of mobile panel
Back of mobile panel
Place the double electrical outlet
in the support, under the panel.
Screw the power bar onto the
support using the pre-drilled holes.
Cable conduit
To remove the cover, pull it towards you.
Attach the cable conduit
Metal top cap