Assembly:
1. First things first: Check for any obvious damage or missing items before proceeding. If
anything looks damaged or missing, remember, you have a right to reject the shipment and
Cutting Edge Power will help you file a claim with the freight company.
2. Insert the vertical pipes into the feet welded to the trailer and tighten down the set screw
with a 9/16" wrench/socket/crescent wrench:
The medium length vertical pipes should be on one side, the shortest vertical pipes on
the other side. Do not attempt to install the medium length / tall pipes in a front to
back configuration. Doing so could cause issues with aerodynamics if you ever need to
drive with the panels. The different heights should be on one side or the other as
shown. The tall side should be on the side with the solar generator in order to open
the solar generator housing lid.
If equipped with a wind turbine: the 8ft wind turbine vertical pipe must be on the
"tall side". It doesn't matter if it's toward the front or back of the trailer.