FLAVIA Creation 400 Gebruikershandleiding - Pagina 15
Blader online of download pdf Gebruikershandleiding voor {categorie_naam} FLAVIA Creation 400. FLAVIA Creation 400 15 pagina's.
Ook voor FLAVIA Creation 400: Gebruikershandleiding (12 pagina's), Instructies voor opnieuw opstarten (2 pagina's)

- 1. Table of Contents
- 2. Safety Precautions
- 3. Drinks Station Layout
- 4. Setting up Your FLAVIA® Drinks Station
- 5. Daily Care of Your FLAVIA® Drinks Station
- 6. Weekly Care of Your FLAVIA® Drinks Station
- 7. Draining Drinks Station
- 8. Beverage/Drink Options
- 9. Troubleshooting
- 10. Safety & Installation Guidelines
INSTALLATION OF YOUR FLAVIA® BREWER
• Drinks Station dimensions
Height - 17" (432mm)
Width - 9.9" (252mm)
A gap of 2.5" (60mm) is required behind the Drinks Station if it is to be plumbed in.
• Electrical Supply
It is important that you have a power supply ready so that we can install your new system quickly
and efficiently.
Notice
•
If you are unsure about any installation requirements, consult an electrician and/or a plumber.
You will need to supply a suitable switched electrical supply to meet the requirements for isolation of
electrical equipment.
i.e. A 15 Ampere supply requires 15 Ampere switched socket or a lockable
isolator. A 25 Ampere supply requires a lockable Isolator unit.
Only use a 120 volt AC single phase power supply.
Use only one system per socket.
Your system comes supplied with a mains lead 6' 6" (2 meters) in length.
• Plumbed Systems
Mains water supply requirements:
- water pressure must be between a maximum of 7 bar (100 psi) and a minimum of 1 bar (14.5 psi)
- flow rate of at least 8.45 oz/minute
- water to be cold and sodium free
- install in accordance with local plumbing regulations
- Drinks Stations should be installed with supplied water filter
Connect mains water to filter with 3/8 in. NPT maile fitting
Jointing compound should not be used in the water supply to the system as this will affect the drink
flavour, only use PTFE tape.
Do not locate the water supply above the mains poer socket
Your system is supplied with a flexible mains water hose 6' 6" in length
• Installing
Please contact your Customer Service Office for your Drinks Station to
be installed.
Depth - 20.5" (517mm)
11
TA B L E D E S M AT I È R E S
Consignes de sécurité
Présentation du préparateur de boissons
Installation de votre préparateur de boissons FLAVIA®
Préparation des boissons FLAVIA®
Entretien quotidien de votre préparateur de boissons FLAVIA®
Entretien hebdomadaire de votre préparateur de boissons FLAVIA®
Vidanger le préparateur de boissons /
Options des breuvages et boissons
Dépannage
Directives d'installation et consignes de sécurité
PAGE
1
2
2, 3
4
5
6
7
8, 9
10, 11