clivus multrum CM14 Installatiehandleiding - Pagina 9

Blader online of download pdf Installatiehandleiding voor {categorie_naam} clivus multrum CM14. clivus multrum CM14 16 pagina's. Waterless composting toilet systems
Ook voor clivus multrum CM14: Installatiehandleiding (18 pagina's), Installatiehandleiding (18 pagina's), Installatiehandleiding (18 pagina's), Installatiehandleiding (20 pagina's)

clivus multrum CM14 Installatiehandleiding
TOILET CHUTE & PEDESTAL
1
Please refer to the separate
pedestal installation manual for
instructions on how to locate the
pedestal in your bathroom.
2
3
IMCM-20.291121
FRONT
BACK
< 5mm of sideways play around the hole.
Note: If the floor of the building is high above
the top of the tank a chute extension piece/s
may be needed. Extra lengths are available from
your supplier. Joints should be screwed with
short self-tapper screws, and sealed with silicon.
If more than 2 chutes are joined then additional
support straps or brackets are needed to support
their weight from the building frame, instead of
hanging only by the top chute.
www.ecoflo.com.au
1300-138-182
A3 Template to
cut chute hole at
the correct size.
Using the outside of the toilet
chute as a template, mark and
cut the chute hole into the top
of the tank.
9