Asgard Access Montagehandleiding - Pagina 3

Blader online of download pdf Montagehandleiding voor {categorie_naam} Asgard Access. Asgard Access 8 pagina's. Bike store
Ook voor Asgard Access: Snelstarthandleiding (4 pagina's)

STEP 1
Z
2-OFF 5mm SQ HOLES
DENOTES RH BACK
5
1
PARTS
INSTRUCTION
RH BACK - 5
POSITION RH BACK '5' UP TO BASE PANEL '1'
ENSURING HOLES ARE ALIGNED AND THAT
BASE - 1
THE BACK CENTRAL FOLD IS POSITIONED IN
THE CUTOUT SLOT IN THE BASE.
THIS PANEL REQUIRES SUPPORT WHILST
SCREWING PANELS TOGETHER.
ITEM 18
3*
STEP 5
DD
3
2
6
PARTS
INSTRUCTION
LOCATE CORNER BRACE '14' TO THE
CORN BRACE
UNDERSIDE OF RH SIDE PANEL '3' &
RH FRONT PANEL '7'
LH - 13
RH - 14
LOCATE CORNER BRACE '13' TO THE
UNDERSIDE OF LH SIDE PANEL '2' &
LH FRONT PANEL '6'
ITEM 18
SCREW CORNER BRACE TO PANELS
12*
FROM UNDERSIDE
STEP 2
3-OFF Ø6.4 HOLES
DENOTES LH BACK
AA
4
PARTS
INSTRUCTION
POSITION THE LH BACK '4' UP TO THE PRE
ASSEMBLED BACK AND BASE ENSURING ALL
LH BACK - 4
HOLES ARE ALIGNED, SCREW TOGETHER.
NOTE A SCREW IS ONLY REQUIRED IN ALL
THE OBROUND HOLES. THE 4 ROUND HOLES IN
EACH OF THE LH & RH BACKS ARE FOR SHELF
BRACKETS WHICH ARE PURCHSED SEPERATLY.
ITEM 18
BOTH PANELS REQUIRES SUPPORT WHILST
10*
SCREWING PANELS TOGETHER.
7
UNDERSIDE
PARTS
INSTRUCTION
STEP 3
2
PARTS
INSTRUCTION
LOCATE LH SIDE PANEL '2' TO THE BASE AND
LH SIDE - 2
LH BACK AS SHOWN ENSURING THAT HOLES
ARE ALIGNED.
RH SIDE - 3
LOCATE RH SIDE PANEL '3' TO THE BASE AND
RH BACK AS SHOWN ENSURING THAT HOLES
ARE ALIGNED.
ITEM 18
SCREW TOGETHER ALONG THE BASE AND
16*
VERTICAL JOINT.
STEP 6
14
9
PARTS
INSTRUCTION
WE RECOMMEND THAT YOU USE HAND HELD
LH DOOR - 9
DRIVERS RATHER THAN POWER DRIVERS
WHEN FIXING THE DOORS.
IT IS IMPORTANT TO SUPPORT THE DOOR
RH DOOR - 10
AT ALL TIMES WHEN FITTING THE SCREWS
TO ENSURE CORRECT ALIGNMENT AND SO
ITEM 19
NOT TO DAMAGE THE THREADED INSERTS.
12*
STEP 4
3
6
PARTS
INSTRUCTION
LOCATE LH FRONT PANEL '6' TO THE BASE AND
LH SIDE AS SHOWN ENSURING THAT HOLES
LH FRONT - 6
ARE ALIGNED.
LOCATE RH FRONT PANEL '7' TO THE BASE AND
RH FRONT - 7
RH SIDE AS SHOWN ENSURING THAT HOLES
ARE ALIGNED.
SCREW TOGETHER ALONG THE BASE & AND
VERTICAL JOINT. VERY IMPORTANT YOU MUST
ITEM 18
PUT THE SCREWS IN THROUGH THE CLEARANCE
14*
HOLES IN THE BASE ALL 14 SCREWS MUST BE
USED
STEP 7
8
10
17
PARTS
INSTRUCTION
LID - 8
FIT M8 BALL STUD PART No17
TO LID AT BOTH SIDES
ITEM 17
2*
CLEARANCE HOLES
IN BASE
BB
7
SS