BlueSky Mast AL350G Series Snelle referentieblad - Pagina 5

Blader online of download pdf Snelle referentieblad voor {categorie_naam} BlueSky Mast AL350G Series. BlueSky Mast AL350G Series 6 pagina's. Primary guying deployment

1
Remove the stakes from the Lift
Base Plate by using the stake
remover.
6
Raise the lift base plate until it
nests firmly into the next mast
pole.
10
Repeat this process until the
red primary guy ring is within
reach.
15
Remove both stakes from the
tripod tilt leg and the left stakes
from the other tripod legs.
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2016 Allendale LLC All Rights Reserved
Quick Reference Sheet - Primary Guying
LOWERING / RECOVERY
2
Unlock the ALL guy ropes and
slide the guy handles toward
the guy stakes 12 inches.
7
Release the cam lock and
SLOWLY lower the mast to the
ground. Remove the mast pole.
11
Remove the 4 primary guy
ropes and unpin the primary
guy ring.
16
Loosen the turn knob on the tilt
leg and kneel the tripod.
AL350G Lift Series
3
Release the cam lock.
8
Raise the lift base plate until it
nests firmly into the next mast
pole.
12
Pull the slack in from all primary
guy ropes, wind them up and
stow them.
17
Remove all equipment from the
mounting pole.
Read Manual Before Use
Refer to detailed instructions in the
AL350G Lift Series Manual at all times
4
Raise the mast up enough to
remove the 1st mast pole .
9
Adjust all 4 PRIMARY Guy Ropes so the mast is straight and perpen-
dicular. You should only have to adjust the primary guy ropes for the
first 2 - 3 center mast poles, unless you are experiencing high winds.
13
Remove the tripod leg struts
from the strut base plate and
secure the struts to the legs.
18
Remove red primary guy ring
and stow it with the guy ropes.
5
Lock the cam lock and lower
the lift base plate and remove
the 1st mast pole.
14
Remove the red tipped strut
base plate stake and stow the
strut base plate.
19
Release the ball stop from the
holder and wind up the cable on
the winch.