Co2meter RAD-0102 Procedura kalibracji

Przeglądaj online lub pobierz pdf Procedura kalibracji dla System bezpieczeństwa Co2meter RAD-0102. Co2meter RAD-0102 3 stron. Co2 safety alarms

Calibration Procedure: RAD CO2 Safety Alarms 
This is a more detailed explanation of the calibration procedure found in the 
manual. Check your state or local code for calibration schedule requirements.                     
At a minimum, you should calibrate at least once a year. 
There are 2 different calibration procedures depending on the altitude at which 
the device is to be used: 
1. 0 ‐ 3,000 ft. (900m): Perform Zero Calibration and Span Calibration. 
2. 3,000+ ft.: Perform Zero Calibration only. 
 
Before You Begin 
1. For Zero Calibration, you will need a gas cylinder of pure nitrogen (0 ppm 
CO2). For Span Calibration, you will need a 2
2. Temporarily cover the buzzer hole in the upper right‐hand corner of the 
SEU (sensor unit) and RDU (remote display unit) with a small piece of 
masking tape to minimize the alarm sound during calibration. 
3. If calibration is to be performed in‐situ, first inform building occupants that 
you will be testing the CO2 alarm for several minutes. 
4. Attach included tubing between the gas cylinders and the SEU calibration 
port as follows: 
a. RAD‐0102SX2 – Connect the tubing to the supplied plug and secure it 
over the air entry / calibration port on the front of the SEU.  
b. RAD‐0102/RAD‐0200 – Connect the tubing to the calibration port on 
the bottom of the SEU. 
    A: RAD‐0102SX2  
nd
 cylinder of 4% CO2.  
    B: RAD‐0102/RAD‐0200